Electric Substation and Transmission Corridor

GPD Group provided topographic base mapping for use in the design of substation upgrades. Our work consisted of highly-detailed survey locations of existing substation equipment and foundations and our survey crews also performed hydrographic mapping of the nearby Cheat River. The hydrographic work was performed with GPD’s Seafloor Systems HydroliteTM portable echosounder.
Owner
FirstEnergy Service Company
Markets