FRA-70-13.54

Columbus, Ohio
This project was a comprehensive review of 35 separate technical reports prepared between 2003 and 2011 by nine different consultants and various state and federal agencies to determine if any previous environmental work needed to be revised during the final design phase of the FRA-70-13.54 project. Additional tasks included preparing the necessary Section 6(f) coordination and the Section 401/404 waterway permits for the freeway bridges over the Scioto River.
Owner
City of Columbus / ODOT
Markets