Cuyahoga River Dam Removal

Cuyahoga Falls, Ohio
This design-build project removed two abandoned dam structures and restored free flowing river conditions along a portion of the Cuyahoga River. GPD Group provided hydraulic river modeling, remnant structure stability analysis, structure and bank stabilization design, and riverbank restoration design to improve riparian conditions and protect the remnant powerhouse structures.
Owner
City of Cuyahoga Falls
Project Cost
$970,000
Completion Date
2014
Markets