Frank Boulevard

Akron, Ohio
This project was initiated to overcome traffic and site distance issues at the intersection of White Pond Drive and Frank Boulevard. The project included full-depth pavement reconstruction with subgrade stabilization, a new storm sewer system, stormwater BMP design utilizing pervious concrete on-street parking lane, traffic signal with railroad interconnect, and LED street lighting.
Owner
City of Akron
Project Cost
$1.9 million
Completion Date
2011
Markets