GI Stormwater Control

Cleveland, Ohio
This project required an innovative design solution to meet stormwater management requirements for a parking lot at a hotel site with a very small project footprint. GPD Group designed a pervious pavement lot and a subsurface stormwater management infiltration system that met the Northeast Ohio Regional Sewer District’s flow reduction requirements by essentially eliminating site runoff into the existing combined sewer system.
Owner
Snavely Development
Markets