Haley’s Run River Restoration

Akron, Ohio
This design-build project restored 2,000 lf of Haley’s Run (tributary to the Little Cuyahoga River) following the removal of contaminated soils. The natural channel and wetlands were reconstructed and the functional floodplain expanded to restore a riparian corridor within an urban setting. A trail amenity was incorporated and the area designated an urban park.
Owner
Lockheed Martin Integrated Systems
Project Cost
$1.1 million
Completion Date
2010
Markets