Highland Road Railroad Separation

Macedonia, Ohio
The project included the construction of a 151 ft long simple-span steel-plate girder bridge on pile-supported stub abutments inside MSE walls, a roadway overpass bridge on existing alignment, the reconstruction of 2,700 ft of two-lane roadway (three lanes at adjacent intersections), extensive drainage improvements and utility relocations and water main relocation. GPD Group helped the City of Macedonia secure HSP funds to partially finance the project.
Owner
City of Macedonia