The existing wastewater plant had reached the end of its useful life and was being inundated with wet weather flows. GPD Group designed a new 150,000 gpd replacement plant that included pre-screening, solids grinding, auger screening, rapid sand filters and an extended air plant. The tanks from the existing plant were converted into a 90,000 gallon aerated flow equalization basin.