STA-Navarre Road System Analysis

Canton, Ohio
GPD worked with Perram Electric on the STA-Navarre Road signal reconstruction project for the City of Canton. The project spanned multiple corridors requiring cross-arterial coordination and included a combination of fully-actuated, semi-actuated and pre-timed signals. In performing the System Analysis, new signal timing patterns were developed and implemented in order to provide maximum operational efficiency of the new signal system. The new coordination patterns and associated timing parameters were field programmed by GPD personnel in each traffic signal controller. Final travel-time studies confirmed that the new timing patterns further reduced vehicular delay and optimized the signal system.
Owner
City of Canton