This project included design of a 138kV interconnection, coordination with AEP, one 90MVA 138kV-69kV-13.2kV transformer, two 138kV circuit breakers, two 69kV circuit breakers, eleven 13.2kV circuit breakers, two capacitor banks, a control house and two dead-end structures.