Cuyahoga Falls City Electric Department Building
The Challenge
The City of Cuyahoga Falls needed a modern Electric Department facility capable of supporting daily operations while serving as a resilient, 24-hour emergency response center during power outages and critical events. The City also sought opportunities to improve operational efficiency, accommodate long-term storage and training needs, and reduce the facility’s environmental footprint.
Our Solution
GPD worked closely with City staff to evaluate multiple sites and develop a comprehensive facility program based on current and future operational needs. Through facility assessments, staff interviews, and site analysis, the team established a Program of Requirements that guided building planning, site layout, utility coordination, grading, and storage accommodations.
Designed as a critical infrastructure facility, the new building incorporates emergency power generation, an uninterruptible power supply (UPS), and fiber connectivity to the City’s data network to ensure continuous operations during emergencies. A dedicated operations center, or “war room,” provides space for staff to monitor and coordinate outage response efforts. The facility also includes heated garage floors, a large training room, and indoor and outdoor storage areas for transformers, utility poles, and maintenance equipment.
The Results
The resulting 53,000-square-foot facility provides the City with a resilient, future-ready operations center that strengthens emergency preparedness, improves operational functionality, and supports workforce training and equipment storage needs. The planned rooftop solar system is expected to reduce on-site energy consumption by approximately 50%, helping the City lower operating costs and advance its carbon reduction goals.