Redesigning a Highly Trafficked Ohio State Route

To provide additional roadway capacity and reduce collisions on a two-mile stretch of a highly trafficked state route that intersects with a major interstate, GPD worked closely with the City of Pickerington to develop a solution. 

First, a safety study identified viable means to provide additional roadway capacity. From there, GPD helped design and develop construction and right-of-way plans for the corridor lane additions, involving significant coordination between multiple government agencies. Improvements consisted of a new third southbound and northbound travel lane, new street lighting and signal upgrades, installation of fiber-optic interconnect network with a suite of adaptive traffic control central software. Gateway features included bronze mast arm signal supports with decorative LED lighting and overhead street name signing along with a companion street tree planting, and landscaped raised concrete medians provided access management.

A travel time study showed impressive project results: a 7% reduction in peak hour travel times, which exceeded the safety study modeling 5% reduction projections.

7% reduction in peak hour travel times

State-of-the-art traffic control systems

Enhanced landscaping design

GPD Group
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.